CALCULADORA DE RECUPERACIÓN CALCULATING THE COST OF BLAST-HOLE DEVIATION. INCREASE YOUR RECOVERY... AND MORE. Blast-hole deviation is a major cause of sub-optimal blasting outcomes and poor stope performance, including; reduced recovery, excess dilution and lost drilling productivity. Minnovare's Production Optimiser technology addresses the primary causes of blast-hole deviation - reducing error at the 'toe' of the average blast-hole by up to 70%. The downstream impact on most underground mining operations is significant. Check out our Calculator below to see just how much impact it could have at your operation. You can skip to the section that most affects your mine, or complete all sections to see the cumulative effect. Skip to: INCREASE RECOVERY REDUCE DILUTION INCREASE DRILLING PRODUCTIVITY AUMENTE SU RECUPERACIÓN: ¿QUÉ SIGNIFICA EL 1 % PARA SU OPERACIÓN? La desviación de los agujeros de tronadura puede hacer que se produzcan subroturas ('puentes') dentro del banco, es decir mineral no recuperado que queda sin explotar, o tener que hacer nuevas perforaciones o rebanado para recuperar el mineral. Production Optimiser mejora sustancialmente la precisión de las perforaciones, reduciendo el riesgo de puentes y aportando a su operación onzas recuperadas adicionales. Solo un 1 % de recuperación adicional puede ser significativo. Guía de producción subterránea: onzas/año Apuntemos a un adicional de: 1%2%3%4%5%6%7%8%9%10% de recuperación Al precio del oro actual: $ /onza El valor de esto alcanza a: $ /año WHAT ABOUT DILUTION? See how the Production Optimiser reduced Evolution Mining’s avg Dilution by 18% Click here for the Case Study REDUCE YOUR DILUTION: WHAT DOES A 10% REDUCTION IN WASTE TONNES EQUATE TO? Over-break of the planned stope is a major cause of dilution - a cost of production that affects the overall profitability of the mine. Reducing blast-hole deviation reduces the risk of over-break and with it, the cost(s) of dilution. Estimated total ore mined (annual): tonnes Estimated dilution: 20%25%30%35%40% Mining & haulage cost (ex processing): $ per tonne That's a cost of dilution of: $ Lets aim for: 10%15%20%25%30%35% dilution That's worth: $ /year cost saving WHAT ABOUT PRODUCTIVITY? INCREASE YOUR PRODUCTIVITY: WHAT WOULD A 15% INCREASE IN DRILLED METERS DO FOR STOPE TURNOVER? The Production Optimiser delivers greater drilling accuracy AND a streamlined rig setup process. This means less re-work and more time spent drilling, which equals more meters and a faster stope turnover (additional recovery). Underground production guidance: oz/year At today's gold price: $ /oz Target annual stopes mined: stopes Average oz per stope: Estimate % of drilling attributed to re-work: 5%10%15%20%25%30% Ore body / primary drilling pattern: Narrow veinDisseminated (fan drilling) *On the assumption that we can increase your drilling productivity by That's an additional: stopes/year That's worth: $ /year LET'S LOOK AT THE TOTAL! See how the Production Optimiser Increased NSR’s drilled meters by 30% Click here for the Case Study INCREASED RECOVERY: REDUCED COST OF DILUTION: INCREASED PRODUCTIVITY: TOTAL BENEFIT: THE BOTTOM LINE:ESTIMATED BENEFIT OF IMPLEMENTING THE PRODUCTION OPTIMISER AT YOUR OPERATION. That's the potential impact that poor drilling accuracy is having at your underground mining operation - in just a single year. Luckily, Minnovare's Production Optimiser technology is applicable to rigs of all makes, models and ages. Implementation and training is simple, with 24/7 support available. SI IMPLEMENTA AHORA...¿CUÁL ES EL PERIODO DE AMORTIZACIÓN? Complete el breve formulario que aparece a continuación y, en función de la información que nos haya proporcionado, le enviaremos una estimación de la rapidez con que Production Optimiser comenzará a producir beneficios frente al costo de implementación. Llamar +61 8 6444 6692 PRUEBA NUESTRAS OTRAS CALCULADORAS DE VALOR CALCULADORA DE DILUCIÓN CALCULADORA DE PRODUCTIVIDAD CALCULADORA DE VALOR TOTAL