NSR Mini Case Study #2 – Less Dilution
04/06/2020
NORTHERN STAR 1 YEAR ON
MINI CASE STUDY #2:
LESS DILUTION
Following the implementation of Minnovare’s Production Optimiser, Northern Star Resources (NSR) have achieved a 0.5m reduction in average stoping width. As a result, 80,000tns of waste dilution per year has been removed from the process.
Jeff Brown, Principal Innovation & Technology at NSR: “At one of our operations, where ore veins can be particularly narrow, we’ve been able to reduce our average stoping width by 0.5m using a ‘Zipper’ pattern – which you can only do if you have great confidence in your drilling accuracy.”
Download the mini case study below, and contact us for further info: